Jump to content

legacy layouts


toptrumps
 Share

Recommended Posts

HI, I'm currently working through them all, I'm up to T's in Barcrest.  After Barcrest, BWB, JPM and BFM are done it's going to be a  matter of days.  If I keep going the rate I am I should be finished the whole collection in about two weeks depending if real life gets in the way.  I will eventually get them all done though.

You can open an old .dat in v5.1 then save it as an .fml so it will run in v19 but of course it won't always have the tweaks that are possible in v19.  That would have to be done separately.  Good luck.

  • Like 2
  • Thanks 1

Not Retired from FME June 2022

Link to comment
Share on other sites

 Share

×
×
  • Create New...